November 2019 – OGTC sign off on the 7″ AVS and DEAP Technology

 

 

Malcolm Banks (foreground), OGTC Wells Solution Manager visits IDT’s assembly room in Sheffield to close out the 7″ AVS / DEAP project. Mark Booth, IDT Senior Development Engineer shows Malcolm the DEAP V2 software and runs through the activation process on the test bench. A full function test on the flow loop was conducted shifting the AVS into all its positions successfully.